Everest Mounting delivered 50MW ZAM Steel Solar Ground Mounting System to Bosnia & Herzegovina. The project Located in Sarajevo,Bosnia & Herzegovina.
The project installed by Everest new designed single post ZAM Steel mounting structure.As the installation site has heavy snow load with more than 60cm, Everest team designed the high yield strength materials were used to improve the overall structural strength and reduce construction costs.